Is a very good idea to mark the.mission with a.different values like
Completed
Working
Pending
For example
To can filter with one of this values
Is a very good idea to mark the.mission with a.different values like
Completed
Working
Pending
For example
To can filter with one of this values
You can always save several versions of the same Litchi flight plan with names that remind you which version you are looking at and which parameters distinguish one version of the mission from the others.
For example, I often create identical flight paths except for differences in the set altitude, cruise speed, and time of day. For missions to be flown at dawn and dusk, I ensure the drone’s camera is not looking directly into the sun which is low in the horizon at those two times.
My typical saved Litchi missions would bear names along these lines.
" River jungle triple loop, Dawn, 140 feet AGL, 28mph, 8 miles, 27 minutes"
“River Jungle double loop, Dusk, 160 feet AGL, 25 mph, 6 miles, 23 minutes”
This way I can select the specific mission I want the drone to fly just from the title I used to save it in the Litchi Mission Hub.